Independent · Australian-built · Human-reviewed

The independent audit of your builder's tender. Before you sign.

Line-by-line bill of quantities, market price comparison, and a risk audit of the fixed-price contract you're about to sign. Built for Australian homeowners. Reviewed and signed by a human.

View sample report (PDF)
  • $249 One-off · pay per tender
  • 24 hours From upload to signed report
  • ±3% Calibrated accuracy on benchmark project
  • PI insured Professional indemnity cover
3,217
Australian builders collapsed in 2024 — up 26% YoY ASIC
$147M
Porter Davis collapse left 1,700 homes mid-build and 779 deposit losses
5 days
Your cooling-off period under VIC & NSW law. We deliver in 1.
$1,500+
What a manual QS pre-contract review costs. We're $249 in 24 hours.
How we keep your estimate accurate

Eight independent data sources. Refreshed every quarter.

A single rate table goes stale within months. Construction costs move 5% a year, and they don't move evenly across states. We triangulate every line item against eight independent sources of current Australian construction cost data, refresh them on documented schedules, and tell you on the cover page how fresh each input is.

ABS Producer Price Indexes

Quarterly · ~30-day lag

Series 6427.0 Table 17 — residential construction output, by state. The authoritative cost-movement signal.

Latest: Dec Q 2025 · +3.4% YoY national

NSW Planning Portal DA register

Daily lodgements

Real cost-of-works estimates on every DA lodged in NSW since 2019. Per-postcode P10/P50/P90 medians.

Latest: Refreshed nightly via Open DA API

RLB Australia Market Insight

Quarterly

Tender Price Index for every Australian capital plus per-trade commentary. Free, current, trusted.

Latest: Q1 2026 ingested

Turner & Townsend GCMI

Annual

Per-capital USD/m² benchmarks. Calibrates our inter-state factors — Brisbane is now the most expensive AU city.

Latest: 2025 edition ingested

WT Partnership + Slattery

Quarterly + ad-hoc

National building escalation forecasts. Cross-check against RLB and ABS.

Latest: WT June 2025 · Slattery Aug 2025

Bunnings + Reece trade pricing

Weekly

Trade-account material pricing across hardware and hydraulics. Anchors line-item materials cost.

Latest: Refreshed every Monday

Council DA open data

Monthly

City of Sydney, Inner West and growing — public CSVs of every approved DA with cost-of-works.

Latest: 2 councils live · 8 more in queue

Tender Check customer actuals

Per project · 6 and 12 months post-handover

With consent, we follow up with every customer at 6 and 12 months to capture actual costs. This is the source no competitor can replicate.

Latest: Compounding from order #1

What this means for your report

Every line in your BOQ shows the spread between sources alongside the mid estimate. Three sources agreeing within 5% — high confidence. Two sources 15% apart — we tell you that, and widen the band. You see exactly which sources informed each number, and when each was last refreshed.

That methodology is documented in full at the methodology page. Refresh cadence is a contractual commitment: if a source is more than one cadence cycle stale at the time your report is signed, we flag it on the cover.

How it works

Upload, audit, sign — or don't.

Our pipeline extracts your drawings with AI vision, builds an independent bill of quantities, compares each line against current Australian market rates, and flags every clause that's likely to cost you. Then a human reviews and signs the report before it goes out.

  1. 01

    Click "Start audit" and pay $249

    Stripe Checkout. Five minutes. We'll email you a secure link to upload your documents next.

  2. 02

    Upload your tender and drawings

    Drag in two PDFs and answer ten short questions about your build. That's it on your side.

  3. 03

    Human reviewer audits every line

    AI extracts ~90 line items. A trained reviewer checks every one, runs the comparison against your tender, and writes the red flags and negotiation talking points.

  4. 04

    You get a 12-page PDF — within 24 hours

    BOQ, line-by-line tender comparison, ranked red flags with dollar impacts, copy-paste negotiation language. Sign with confidence or push back with evidence.

The report

A real PDF you keep. Not a chatbot reply.

Executive verdict

One-page scorecard at the top: total, our independent estimate, delta, verdict (fair / above / significantly above) and the top three actions before signing.

Line-by-line BOQ

~90 items across substructure, frame, roof, envelope, finishes, services. Each with quantity, unit, market low/mid/high, our total, and a confidence rating.

Tender vs market comparison

Trade-by-trade. Where is the margin above norm? Which trades are under-allowed? What looks fair? Each delta shown in dollars and percent.

Red flags, ranked

Critical, warning, info — each with an estimated dollar impact. Missing geotech? Uncapped rise-and-fall? Council infrastructure charges absent? Each one written for you to understand and your builder to respond to.

Copy-paste negotiation language

Eight talking points ranked by likely return. "Please cap rise-and-fall at 5% in line with VIC's 2025 protections legislation." Sentences you can email your builder verbatim.

Signed by a named reviewer

Every report has a real human's initials on the cover. We will never automate the sign-off. PI insured. Drafted under terms reviewed by an Australian building solicitor.

Pricing

One price. One-off. No subscription.

Pay once for an independent line-by-line audit of your builder's tender. PDF report in 24 hours.

Tender Check
$249inc GST

Independent audit of one Australian residential building tender.

  • Line-by-line BOQ
  • Market price comparison
  • Red flags with $$ impact estimates
  • Negotiation language
  • Human reviewer signature
  • 24-hour SLA · PDF report you keep

Every report comes with

  • Information service positioning · no legal or financial advice
  • Human reviewer signature on the cover
  • Every figure cited to its primary source
  • 100% refund if we can't produce a useful report

What's not

  • Subscription required
  • Builder commission paid to us
  • Generic chatbot answers
  • Marketing emails after delivery

Available Australia-wide. Highest calibration confidence in VIC and NSW project-home tenders. Other states: same price, wider confidence band — we tell you on the cover page. Custom build or owner-builder permit? Get in touch — we handle those case-by-case.

Things people ask

Frequently asked.

Is this a quantity surveyor report?

No. We're not a licensed quantity surveying practice. We're an independent information service that uses AI document extraction backed by human review. The output uses the same methodology as a QS-style report, but we don't sign certificates of construction cost and we don't accept liability the way a QS firm does.

If you need a stamped QS report for a court, bank, or depreciation schedule, you need a QS firm. If you want to sanity-check the contract you're about to sign for $249 in 24 hours, you want us.

How accurate is the BOQ?

Our most recent benchmark run produced a mid-estimate within 3% of actual cost on a real Australian benchmark project. Each line carries a confidence rating (high / medium / low) so you know which numbers we're sure about and which are estimates. We refresh rates against current Bunnings and Reece pricing weekly, the ABS Producer Price Index quarterly, and re-calibrate against new real-project data as it comes in. The full list of sources and refresh cadences sits at Data sources.

Who reviews each report?

Every report is reviewed and signed by a trained human reviewer before it goes out. We list the reviewer's initials on the report cover. In the first phase, that's the founder personally. As volume grows we'll bring in QS-trained reviewers part-time. We will never automate the sign-off step.

What if the report says my tender is fair?

That's a good outcome. Most tier-1 builder tenders we benchmark come in within 3–8% of independent market pricing — that's "fair, upper-band". When that happens, the report tells you so, and then redirects you to the risks: which clauses are uncapped, which inclusions are missing, what to confirm before signing.

The price being fair doesn't mean the contract is. That's most of what we find.

Will my builder be upset?

Probably not, if you handle it well. The negotiation language we provide is fact-based and respectful. We never frame the builder as the bad guy. Most builders respond reasonably to a customer who has done their homework. Some don't, and that's a useful signal too.

Do you keep my drawings or tender?

We store your uploads encrypted for 30 days for QA and dispute purposes, then delete. We may anonymise the structure of your tender (no names, no addresses) to improve our calibration over time. You can request deletion at any time.

Which states do you cover?

We audit residential building tenders Australia-wide for the same $249. Our calibration is most accurate for VIC and NSW project-home builders, where we have the most reference data. QLD, WA, SA, ACT and TAS: same price, wider confidence band — and we tell you exactly what that band is on the cover page of your report. If you're outside a major capital, email us first so we can flag any specific gaps before you order.

Are you insured?

We carry professional indemnity insurance and our T&Cs are drafted by an Australian building solicitor. We explicitly limit our liability to refund of the report fee. We are not a substitute for legal review of your contract — we recommend pairing our report with a $400–$900 contract review from a building solicitor.

Send us your tender. Get the audit by tomorrow.

Pay $249 by Stripe. We'll email you a secure link to upload your documents. A reviewed PDF report arrives in your inbox within 24 hours.

View sample first

No account required. No subscription. Refund if we can't help.